Gauthier, Alvarado & Associates Portfolio

FBOP Butner Generator

This three-phase design and construction project involved the addition of a 2000 kW, 7,200/12,470 volt, three-phase, four-wire, diesel generator to provide standby power for the entire facility. The design and construction of the generator was divided into phases to minimize impact to ongoing facility operations for the Federal Bureau of Prisons.

GAA Services:

  • Electrical Design
  • Mechanical Design
  • Construction Administration

More Project Information

FBOP Butner Generator

Butner, North Carolina

Design and construction phase services for the addition of a 2000 kW, 7,200/12,470 volt, three-phase, four-wire, diesel generator to provide standby power to entire facility. The new generator design interfaced with existing medium-voltage switchgear. The project was divided into three phases to minimize impact to ongoing facility operations. Phase One consisted of design and construction of the generator building and pad. Phase Two involved adding underground concrete-encased duct bank and wiring between existing switchgear and the new generator. Phase Three incorporated the addition of the generator, 10,000-gallon aboveground fuel tank, day tank, and generator controls.

Portfolio Projects

Let's Build Something

Thank you for visiting Gauthier, Alvarado & Associates. If you have questions about our firm, our services or have any other inquiries, please contact us. Our goal is to provide the highest quality service to our clients.

Gauthier, Alvarado & Associates
10201 Fairfax Boulevard, Suite 225,
Fairfax, VA 22030
TEL: 703.241.2202

SBSD Logo
USGBC Membership
ICC Member